Hybrid Solar Power Station50 kW with Backup
Hybrid Solar Power Station50 kW with Backup
Price: $62,200
Would you like to order a solar power station or receive a consultation from a specialist?
Submit a request, and our manager will contact you.
Equipment
Photovoltaic Module Longi LR5-72HIH HI-MO 580 Warranty: 12/25 years | 105 pcs |
Three-Phase Hybrid Inverter Deye 50 kW + Monitoring | 1 pc |
Battery Deye BOS-G HV Kit 61 kW | 1 pc |
Mounting for Flat Roof, Ballast System | 105 pcs |
Automatic Inverter Protection Kit (AC/DC) | Yes |
Solar Cable PV-6 + Power Cable | 650 m |
Installation Materials Kit | Yes |
Design | Yes |
Installation Works | Yes |
Legal Support - Assistance in Opening Construction in The State Inspection of Architecture and Urban Development of Ukraine | Yes |
Start-Up and Configuration Works | Yes |
Total Cost (Turnkey): | $62,200 |
Frequently Asked Questions
- Increased Compensation Rate: Up to 100% of energy consumption.
- Reduced Monthly Expenses.
- Lower Production Costs.
- Energy Accumulation: Store excess generation for later use.
- Power Source Management: Prioritized source control for the enterprise.
- Fixed Electricity Rate: $0.05 for the operational years of the station.
- Equipment Lifespan: 20 years.
- Assessment of Load-Bearing Structures: Expert report included.
- Detailed Inspection of Internal Electrical Networks: Consumption graphs provided.
- Design and Equipment Selection.
- Equipment Procurement and Delivery to Site.
- Construction Start and Registration inThe State Inspection of Architecture and Urban Development of Ukraine.
- Start-Up and Commissioning of the Station.
- Completion Registration in The State Inspection of Architecture and Urban Development of Ukraine
- Technical Report on Roof Load Capacity.
- Structural and electrical calculations.
- Explanatory Note.а
- Cost Estimate.
- Service Life of the Solar Power Station: 25 years.
- Linear Warranty on Photovoltaic Modules: 12 years at 90% output, 25 years at 80%.
- Inverter Warranty: 5 years.
- Battery Warranty: 10 years.
- Work Warranty from GREEN SYSTEM: 5 years.
- Annual Generation of the Solar Station: 72,000 kWh.
- Tariff Cost for Business Electricity Consumption: 7 UAH or $0.185 per kWh.
- Annual Savings from Own Generation: $13,320.
- Payback Point: Achieved by the 54th month (4.6 years) of active operation, assuming full consumption of generated energy.