Grid-Connected Solar Power Station with a Capacity of 150 kW for a Business in Melitopol, Zaporizhzhia Region

Location: Melitopol, Zaporizhzhia Region

Date: June 2021

  • Compensation of up to 70% of energy consumption
  • Reduction of monthly expenses
  • Decrease in production costs
  • Increase in capacity without the involvement of the energy supplier
  • Compensation of reactive power and voltage balancing across phases
  • Stable electricity costs
  • Equipment lifespan: 20 years

Design Features

The solar power station was built to compensate for the self-consumption of a sewing factory. The building has a flat roof, so a ballast mounting system was used to achieve the necessary tilt for the photovoltaic modules.

What was used?

  • Ballast mounting system for flat roofs (KRIPTER)

  • ROSEN 320 W photovoltaic modules

Turnkey Services Provided

  • 1 Project Design
  • 2 Selection and Procurement of Equipment
  • 3 Installation and Commissioning Works
  • Warranty from GREEN SYSTEM: 5 years on completed works
  • Manufacturer’s warranty on equipment.

Ready to discuss your goals and get expert advice?

Submit a request, and our manager will contact you.